Independent journal on economy and transport policy
14:08 GMT+2
This page has been automatically translated by Original news
Today in the port of Genoa two destined cranes of dock to the VTE have arrived
With new means of raising they could be served portacontainer give beyond 10.000 teu
November 27, 2012
Today in the port of Genoa 20 two new cranes of destined dock have arrived on board of the Zhenhua ship loaded 30th August to Shanghai and to the container terminal managed from the Voltri Terminal Europe (VTE) with group PSA International. Thanks to these two new means of raising, that they will be operating from the next January, VTE will be able to serve portacontainer gives beyond 10.000 teu of ability and to operate with 12 cranes of dock.
In the first ten months of the 2012 VTE it has enlivened a traffic of the container pairs to 1.027.429 teu, recording an increase of 10% regarding the same period of 2011.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher