Independent journal on economy and transport policy
12:26 GMT+2
This page has been automatically translated by Original news
public Consultation for the realization to Marseilles Fos of a dock between the container terminal Eurofos and 2XL
Previewed the construction of a landing place of 243 linear meters with depth of the -17 backdrop meters
March 6, 2017
The Harbour Authority of Marseilles has organized for the 14 and 17 March next two public reunions in order to discuss about the widening project of the terminalistica area of Fos dedicated to the traffic of the container that previews the construction of a new dock of 243 linear meters with depth of the -17 backdrop meters on the uncultivated land that currently separates to the two container terminal of Fos.
The project, that it represents the completion of the project Fos 2XL, previews the connection of the lines of dock of the two already operating terminals in the area, that is the container Eurofos terminal that has dock of beyond 1.500 meters and is managed by Portsynergy, society that is under responsibility of the Terminal Link that is participated to 51% from the French shipowning group CMA CGM and to 49% from the Chinese Merchants Holdings (International) Co Lowers., and of the terminal Fos 2XL that has 830 linear meters of dock with depth of the -15/16 backdrop meters and is managed by the Seayard, society participated to 50% givesthe Terminal Investment Limited (TIL) of the shipowning group Helvetic Mediterranean Shipping Company (MSC), to 42% from the APM Terminals of shipowning group Danish A.P. Møller-Mærsk and to 8% from shipowning group Chinese COSCO Shipping.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher