Independent journal on economy and transport policy
14:45 GMT+2
This page has been automatically translated by Original news
Terminal Container Ravenna, completed the leveling of the seabed in the area in front of the old ro-ro jetty
The dock allows the simultaneous docking of three ships
May 27, 2020
With the intervention TCR today offers a total of a platform 670 metres equipped with four cranes ship-to-shore and a mooring space that allows docking contemporary of three ships. The terminalist company emphasised that this intervention ensures that shipping companies an immediate berth, minimizing waiting times in the clear. Also with the removal of the former wharf it also improves the safety of navigation in the canal. Ravenna port thanks to an even more room for manoeuvre Large.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher