ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

20 August 2019 The on-line newspaper devoted to the world of transports 03:21 GMT+2



December 11, 2012

This page has been automatically translated by
Original news
Operating the first 18,5 kilometers of the railway line to high speed between Bari and Naples

They connect Cervaro with Bovine. The doubling of the draft will be completed within 2014

Yesterday high Bari-Naples ability is returned the first 18,5 kilometers of the railway line operating high speed/, between Cervaro and Bovino (Foggia). Italian Railway net (RFI) has explained that so the realization in varying has been concluded of first of the two railroads of the future doubling between Cervaro and Bovino, than from today will be used by the trains in both the march directions. RFI has specified that within 2014, when the doubling will be completed for a total length of approximately 23 kilometers, the operating feature of line from yesterday will be dedicated to the circulation of the trains in Foggia direction and the other to that of the trains in Caserta direction.

The total investment for the Cervaro-Bovine draft piles to 230 million euros. RFI has evidenced that, to single four months from the signature of the “Institutional Contract of Development” for the realization of the director Napoli - Bari - C#lecce - which signed Taranto 2 the August slid from the minister of the Territorial Cohesion, from the minister of Infrastructures and the Transports, from the Regions Campania, Apulia and Basilicata, from FS Italian and RFI, the Apulia has completed the first important step. “The operativity of the first 18,5 kilometers of the line high ability Taranto-C#lecce-Bari - Naples, in the feature they shape between Cervaro and Bovino - has confirmed the city council member to Infrastructures and mobilizes of the Region Apulia, Guglielmo Minervini - they are a good news. First, first step - it has observed - towards the connection of the adriatic ridge to the subway of Italy that travels to high speed and that up to now it has cut outside an important piece of the Country”.

“Italian Railway Net - it has added Minervini - finally demonstrates to mean it. The Regions Puglia and Campania have supplied an important contribution assigning, with the signature of Institutional Contratto of Development, 800 million for the completion of the plan. It must - it has emphasized the regional city council member - run also on the of Campania feature, still firm to the preliminary plannings. We will have a chance for verify the total state of performance of the intense activities in the direction cabin that will hold Wednesday to Rome with the minister Barca. Now servants to make an investment fort with new European programming 2014-2020 in order to find approximately three billions lacking in order to realize the entire work”.

PSA Genova Pra'
Vincenzo Miele



Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail