Independent journal on economy and transport policy
02:45 GMT+2
This page has been automatically translated by Original news
the terminal cruises Altona di Amburgo will be equipped of a system in order to supply electric power to the ships
For the realization of the system of cold ironing an investment of 8,85 million euros is previewed
September 10, 2013
Today the Senate of Amburgo has decided to equip the port of the city of a system of cold ironing to the aim supplying electric power to the cruise ships berthed to the dock of the terminal Altona cruises let alone of infrastructures necessary in order to allow supplying of electric power with the cruise ships through barges. The previewed investment piles to 8,85 million euros to which they join 24 thousand euros per year in order to cover the fixed operating costs.
In the 2013 crocieristico traffic in the port of Amburgo it previews the ports of call of 177 ships for a total handling of beyond means million passengers. The estimated value of the realized crocieristica activity in the port of Amburgo is of beyond 200 million euros and more than 1.400 places than job they depend on the field.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher