Independent journal on economy and transport policy
23:23 GMT+2
This page has been automatically translated by Original news
Port of Livorno, the work of restoration of the functionality of the Benghazi Descent concluded
Removed the hoof of the old wall of control of the dock
March 10, 2017
In the port of Livorno the work of restoration of the functionality of the Benghazi Descent has been concluded, than it is found in the heart of the pole of the rotabili, in the Dock n.1 of the commercial port. The work has been capacity to term from the Somit society of Chioggia that has demolished the reinforced concrete hoof of the old wall of control of the dock, dredging the next backdrops and carrying them to -10,5 meters.
The foundation of the old wall of dock was developed for about 320 meters to a depth between -8 and -11,5 meters.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher