ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

24 April 2019 The on-line newspaper devoted to the world of transports 09:51 GMT+2



December 14, 2018

This page has been automatically translated by
Original news
Agreement RFI - AdSP of the Adriatic September in order to upgrade the railway infrastructure of the port of Venice

In the long period the planning of the feasibility of a new port of call is previewed goods in the peninsula of the petrochemical one

Yesterday the managing director and general manager of Italian Railway Net (RFI), Maurizio Gentile, and the president of the Authority of the Harbour System of Mare Adriatico Settentrionale, Pino Musolino, an agreement has undersigned, that successively it will be signed also by the Region of Veneto, in order to improve the railway infrastructure to service of the port of Venice with the planning and the realization of the participations of infrastructural potenziamento in the Railway Comprensorio of Venice Marghera Port of call, strategic logistic node of the territory and the European net for the railway corridors TRIES.

The participations necessary in order to improve the managerial and infrastructural efficiency in the Comprensorio - the whose railway system comprises 65 kilometers of net, a station of breaking in the national net, three railway parks, a railway enterprise of maneuver and 25 connected terminal - are characterized by instituted working group in February 2018 with the subscription of a first protocol of understanding.

In 2019 a first phase of participations in the station of Marghera is previewed Port of call for the attrezzaggio of ulterior which electrified railroads and the adaptation of the module to 750 meters (European standard of length of the trains), which they will gradually follow over the years ulterior phases of participation is technological (realization of a new Computerized Central Apparatus) that infrastructural. Between these last ones it finds space the rifacimento and the implementation of Breda Park situated along Regional Road 11.

For the phase of long period the feasibility will be planned of a new port of call goods in the peninsula of the petrochemical one and its direct connect one with national the railway net.

Parallel it will continue also the analysis on the necessary activities for the restoration of the railway connection between the port of Chioggia and the national net.

In occasion of the signature of the agreement respect is announced that in the first eleven months of this year the enlivened railway wagons in the port of Venice have been 93,643, with an increase of +11.3% the same period del2017, pairs to beyond 2,4 million tons of goods transported on track (+10.7%).

ABB Marine Solutions
Evergreen Line



Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail