ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

09 July 2020 The on-line newspaper devoted to the world of transports 13:23 GMT+2



June 26, 2020

This page has been automatically translated by
Original news
Completed in Shanghai the construction of a reservoir drying for the construction of large cruise ships

The property is 740 metres long and 76 metres wide

At the Shanghai Waigaoqiao Shipbuilding Co. shipyard (SWS) China State Shipbuilding Corporation (CSSC) group construction of a large dry dock has been completed which was purpose-built with the purpose of being able to build the largest cruise ships that will be Asian market, which is expected to be start by the end of this year.

The construction of the basin, designed by China Shipbuilding NDRI Engineering Co. of the CSSC Group and implemented by ccCC Third Engineering Bureau Co. of China Communications Construction Group Co. (CCCC), was carried out in 20 months and involved length from 540 to 740 meters the length of a basin 76 meters wide.


PSA Genova Pra'



Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail