ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

22 September 2020 The on-line newspaper devoted to the world of transports 12:24 GMT+2



September 1, 2020

This page has been automatically translated by
Original news
In the port of Taranto, the warhead of the San Cataldo Pier

The work covered an area of about 8,150 square meters

Today, the warhead was inaugurated in the port of Taranto San Cataldo Pier, a maritime operation that had previously been unfit and that is restored with reconstruction Rcm Constructions of the Rainone group, company that has already completed its completion at the port of Puglia the adaptation of a section of the Polyseettorial Pier, also of the new running routes of the quay cranes and the dredging of the 20 metres wide of the quay wire.

The works on the head of the San Cataldo Pier, which affected an area of about 8,150 square meters, have become necessary for the advanced state of structural degradation that concerned the southeast boundary portion of the pier adjacent to the warhead. Over Rcm Construction is currently engaged in this intervention in the port of Taranto in the consolidation of Calata 1, the and the extension of the east quay of St. Cataldo Pier, through the elimination of the current rise, and the accommodation back areas.

Speaking today at the opening of the completion of the works at the San Cataldo Pier, the Minister for the South and Cohesion Giuseppe Provenzano, thanked both Port Authority of the Jonio Sea the company that carried out the work, stressing that it is "delivered, a case more unique than rare in Italy, ahead of schedule, with no accidents at work."

PSA Genova Pra'
Autorità di Sistema Portuale Mar Ligure Orientale



Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail