ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

21 October 2019 The on-line newspaper devoted to the world of transports 22:46 GMT+2



December 14, 2012

This page has been automatically translated by
Original news
Introduced to Trieste a shared proposal of harbour railway layout

She will be subordinate to Italian Railway Net

Today the Harbour Authority of Trieste has introduced a study of feasibility for the "Potenziamento and efficientamento of the railway activities in the Port of Trieste, pier V, pier YOU and pier VII". "The elaborated one - the president of the harbour agency has explained, Marina Monassi - is yields shared of an intense job carried out from the technicians of Harbour Authority, Alpe Adria, the harbour operators and is respectful and functional to a balanced development of the traffics. The successive passage to that today's one will be - besides the involvement of the Region Friuli Venice Julia and the other interested institutional subjects - forwards of the study of feasibility to Italian Railway Net (RFI)".

The study represents a railway system that better satisfies the current and future requirements which reported to the traffics and the enslavement of the nodal points presents in the Franco Nuovo Point (pier V, Pier YOU and Pier VII). They are analyzed, in fact, also the not accompanied arranged international traffics that they characterize the railway activity of the Franco Nuovo Point.

"In the transeuropea net of the transports (IT TRY), as redefined by the EU commission in the new regulations under approval from the European Parliament - the managing director of Alpe Adria has remembered, Antonio Gurrieri - in the ten great corridors of the Core-Network the port of Trieste it is characterized like one of the "maritime Cores ports", in particular regarding the aces of the Corridor number 1 "Adriatic-Baltic Sea", on the director Sud-Nord and of the "Mediterranean Corridor" number 3 (former Corridor 5 or PP6) on the director Est-Ovest, and for this is seen like "node" of international interest. In order to align the national and local policies to such European strategic objectives - it has found Gurrieri - it turns out right, as well as strategic for the development of the harbour, provincial and regional territory, to preview the adaptation of so-called "the comprehensive Network", that is of infrastructures of logon with the "Cores corridors" and, consequently, of the railway furnishings for the potenziamento/connection between the system of Trieste Marzio Field and the convogliamento of all the back-harbour area; it becomes therefore necessary to activate a first study of feasibility in order to better go to comprise the impact and the criticalities of the infrastructural layout and the spaces to dedicate".




Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail